MATERIAL
1. Will the job be flush cut up to/under the base or will quarter round be needed?
2. What quantity of material will be needed?
3. What is the material’s
- a. Manufacturer? Style? Color?
- b. Square feet per carton?
SUPPLIES
1. Will the following supplies be needed?
- a. Adhesive? If yes, how many containers?
- b. Quarter round, shoe molding and/or base board?
- i. If yes, how many lineal feet?
- ii. If yes, will it be painted or stained?
FREIGHT/DELIVERY
1. Will there be freight costs for materials and/or supplies?
LABOR
1. Will there be labor costs? If yes, is it for…
- a. Quarter turn tile or straight?
- b. Quarter round, shoe molding and/or base boards? If yes, painted or stained?
TRIM/TRANSITIONS
1. Will cove base be needed? If yes, go to Cove Base Check List.
2. Will (matching) transitions be needed? If yes, go to Transitions Check List.
DISCUSSION POINTS WITH CUSTOMER
1. Has the layout been discussed with the client?
- a. Where is the starting point for each area and/or surface?
2. Has the following been discussed with the client?
- a. Floor preparation and float are NOT included in quote.
- b. Waxing is NOT included.
For more information regarding this checklist or your current project, please contact us at (713) 554-4700.
Floor Zone LLC
2020 Antoine Dr Houston, TX 77055
www.floorzonellc.com