• Flooring should be done after the plaster work of ceiling and wall is over.
  • Fix all electric pipes, water supply pipes and sanitary/ sewer pipes before start of flooring.
  • In case of multi-story building, start the flooring from top to bottom to minimize movement to newly cast flooring.
  • Ensure that the earth is fully compacted before starting the process of floor lying.
  • Ensure that the base coat is fully compacted before starting the flooring.
  • Do proper slope in basec oat for ensuring uniform thickness of topping.
  • Ensure the quality and size of material used in the flooring in no case does not use fine sand in concrete mix use for flooring.
  • Ensure proper mixing of mortar or concrete used for flooring.
  • Ensure the ratio of cement concrete should be not less than 1:2:4 and mortar is not less than 1:3 for tile, kota and marble
  • Cement concrete or terrazzo flooring should be done in panels by using glass or aluminum or iron strips.
  • Ensure that level should be marked on walls and pillars for proper levels and slopes.
  • Ensure proper slope to floor trap or pipe for easy drainage or disposal of water in case of toilet, laundry, verandah and balcony etc.
  • Movement should be avoided on freshly laid floor, since the marks left on flooring.
  • Do not use glass strips in terrace, balcony floor to avoid leakage.
  • Ensure skirting should be made on walls for proper finishing of joints and protecting the bottom part of plaster and paint.
  • Ensure that polishing should be done after completion of painting.
  • Ensure the filling of joints should be properly done after cleaning the joints including washing the joints and surface.
  • In case of tile flooring, marble or kota stone flooring, ensure the joints should be in straight line and fully grouted.